The new legs have arrived (7/4/25)
Today the new steel posts have been put into position and are ready to be concreted in. The front four posts have been upgraded to 100mm to match the timber posts above them (thanks for the up-sell Shane). The one on the far right front has been brought in 200mm so that when we get to building the RW and roof the gutter doesn’t hang over the property boundary line. That detail was missed in the original design but was an easy fix. We may run the RW from the garage to the street on an angle or just straight and plant a hedge for privacy.