The Crane
The Crane (30/4/25)Sometimes getting in a helper is useful. We had a 7mtrs double-welded 300PFC as well as 20 300x45 LVLs at 12 metres to all go to the back…
The Crane (30/4/25)Sometimes getting in a helper is useful. We had a 7mtrs double-welded 300PFC as well as 20 300x45 LVLs at 12 metres to all go to the back…
Framing (day 2 - 23/4/25)Huge progress by Brad and Sons. Tamati and Joe from Platinum Concreting also worked hard to get the steel footings ready for pouring tomorrow. And yes,…
Framing (day 1 - 22/4/25)Finally the framing has started, six packs of 6000x90x35 MPG12s delivered by Paul from OzBuild. The steel for the RW Phase 2 also arrived today. Brad…
FramingFraming is exactly that, building frames, in our case we used treated pine. Your engineering plans must specify the requirements for framing (e.g. H class, strengths, having double bottom and…