Some might think that engineering plans are very straightforward from an owner builder’s perspective. We don’t have much (if any) input other than during the draft review period. Some suggested materials can be swapped, for example c-channel vs PFC steel beams or you may want to up the size of one or more framing walls from 70mm to 90mm. Generally, the engineers get it right first go (i.e. it will meet/exceed the relevant standards) so don’t worry about not understanding everything in the plans.

Make sure you do check the plans and ask questions if anything isn’t clear.

We made the mistake to not check the proposed beam structure which we ended up getting updated the day before the house raising started. Try to avoid that mistake!

23 July 2024
Getting quotes
Getting quotes

We approached 3 engineer companies, quotes we reasonable compariable

22 August 2024
All systems go!
Engaged a certifier

Local engineers engaged

21 August 2024
Sitting on rock
Soil testing

Easy access to get two samples

15 September 2024
Contacting the neighbours
Handed over DDs

Sent a copy of the detailed designs for action.

11 September 2024
Finally
Site Visit

Taking photos of roofline and measurements of existing posts/members

21/11/24
Finally somethimg to look at
Preliminary Plans

Reviewing and final soon (hopefully)

6/12/24
Plans Completed
Final Plans

Done, ready to send to the house raisers