You are currently viewing House Raising (Day 1)

House Raising (Day 1)

House is in the Air (14/3/25)

Today, 14/3/25 the house has been lifted from her stumps for the first time in 128 years sitting on a few stacks of timber styes.

The floor levels from left to right were 112mm out, the old timber stumps didn’t take any effort to push over. I couldn’t open the front door from the outside but went inside through the temp French doors ply, inside moved lots but nothing bad.

The new house extension has ben prepared with 3x 12 mtr 180mm PFCs on timber styes ready for Monday.

Pushed back the concretor by another week so the house raisers are out of the way.

No response yet from the engineers, following up again on Monday.