Building Approval
After getting BCC Development Approvals on Wednesday 15 January 2025 we needed to get Building Approval (BA) which meant that our Building Certifier has to issue the development permit for carrying out the actual building works. The BA consists of (1) a Decision Notice and (2) Approved Plans.
Without building approval you can’t do any building works including demolition (except for internally of course). Make sure that you check the architectural designs and the engineering designs as there will most likely be some questions coming your way.
Getting BA was not that involved, just make sure that you talk with your private certifier and answer any questions, such as in relation to retaining wall heights if they are over 2000mm high (as different rules apply).
We got our BA on 30 January 2025, only two weeks after DA.
- 2021 Revision of AS 1684 – Residential Timber Frame Construction Standard
- ABCB Housing Provisions Standard 2022 (1 May 2023)
- AS 3660.1:2014 Termite management, Part 1: New building work
- AS 4440-2004[Current] Installation of nailplated timber roof trusses
- AS1684.2 – Residential timber framed construction (Part 2: Non-cyclonic Areas)
- AS1720.1 – Timber Structures (Part 1: Design methods)
- BCA Glazing Provisions
- Building Act 1975 (Qld)
- Construction Australian Standards Store
- GEMS Act: 2017 Review
- Housing Industry Association
- Installation Guide 2020 Roof Truss
- NCC 2022 – Consolidated Requirements (1 May 2023)
- NCC 2022 Complete Series
- NCC 2022 Volume One – Building Code of Australia (1 May 2023)
- NCC 2022 Volume Three – Plumbing Code of Australia (1 May 2023)
- NCC 2022 Volume Two – Building Code of Australia (1 May 2023)
- SmartLVL 13 Design Guide
- Timber structures Part 3: Design criteria for timber-framed residential buildings
- Understanding AS1684-2